[Video] Crane leaned down at Reactor3

According to Tepco, the remote controlling 600 tones crawler crane leaned down beside reactor3.

Tepco reports it didn’t cause any damage on reactor3 building, data shows no abnormality.

The cause is not verified.

At 8:35 AM of 9/5/2013, the operator observed the crane gradually leaned. It is located on the west side of reactor3 building.

A crack was found on the joint part for the main mast and jib.

 

↓ Video of the moment when the crane leaned. (1:33~)

 

Crane leaned down at Reactor3

 

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130905_06-j.pdf

http://www.tepco.co.jp/cc/press/2013/1230314_5117.html

 

 

You can ignore the truth but the truth won’t ignore you.

_____

Français :

[Vidéo] Une grue s’affaisse à côté du réacteur 3

 

Selon Tepco, la grue télécommandée de 600 tonnes s’est couchée au sol à côté du réacteur 3.

Tepco déclare que ça n’a provoqué aucun dégât au bâtiment du réacteur 3 et que les données ne présentent aucune anomalie.
La raison n’en est pas établie.
Le 5 septembre 2013 à 08:35, l’opérateur a vu la grue se coucher progressivement.
Elle est sur le côté ouest du bâtiment du réacteur 3.
On a trouvé une cassure sur la partie jointive entre le mât principal et la flèche.

↓ Vidéo du moment où la grue s’affaisse. (1:33~)

Crane leaned down at Reactor3

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130905_06-j.pdf
http://www.tepco.co.jp/cc/press/2013/1230314_5117.html

Vous pouvez ignorer la vérité mais la vérité ne vous ignorera pas.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories

September 2013
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
30