Posts From Mochizuki
Radioactive material released from Fukushima plant doubled up since last year
The released amount of Cs-137 and Cs-134 from the crippled reactors in Fukushima plant reached over the double compared to the previous year. Tepco released their monthly report about the
Another Fukushima worker died, no details announced
On the daily report of 1/22/2019, Tepco briefly announced a Fukushima worker was confirmed to be dead on the previous day. The report has only 2~3 lines, none of the
Video and photo footage of the first contact to molten core in Reactor 2
Following up this article.. Tepco contacted molten fuel in Reactor 2 yet 98 percent unknown [URL] Video and photo footage were released by Tepco on 2/14/2019.
Tepco contacted molten fuel in Reactor 2 yet 98 percent unknown
On 2/14/2019, Tepco announced they managed to contact the molten nuclear fuel on the bottom of the Primary Containment Vessel of Reactor 2. The research was implemented on 2/13/2019. No
Aftershocks occurred over 85 times by 11am of 23rd Nov after M7.4
Following up this article.. [Breaking] M7.3 Fukushima offshore / 3m of Tsunami is coming / Fukushima plant status unknown [URL] According to JMA (Japan Meteorological Agency), they observed over 85
Marine radiation monitoring post down after M7.4
Following up this article.. [Breaking] M7.3 Fukushima offshore / 3m of Tsunami is coming / Fukushima plant status unknown [URL] In the evening of 11/22/2016, Tepco announced the radiation monitoring
Coolant system of DAINI SFP3 rebooted
According to NRA (Nuclear Regulation Authority), Tepco rebooted the coolant system of SFP 3 of Fukushima DAINI at 7:47AM (JST). Tepco explains that the tank water level related to SFP
Coolant system of SFP3 in Fukushima DAINI got automatically suspended / 2544 fuel assemblies stocked
According to Tepco, Fukushima DAINI‘s spent fuel pool of Reactor 3 had its coolant system suspended automatically. It stocks 2,360 spent fuel assemblies and 184 new fuel assemblies. No more
[Breaking] Iwaki city coastal area overly jammed / Run by foot now
Following up this article.. [Breaking] M7.3 Fukushima offshore / 3m of Tsunami is coming / Fukushima plant status unknown [URL] A local posted on twitter that the coastal area of Iwaki
[Breaking] M7.3 Fukushima offshore / 3m of Tsunami is coming / Fukushima plant status unknown
According to JMA (Japan Meteorological Agency), M7.3 occurred Fukushima offshore at 5:59 AM (JST). The depth of epicenter was 10km. They are warning 3m high Tsunami is reaching the coastal