Tag "tepco"

Back to homepage
Breaking news Core removing struggle Fukushima Plant

More than 1,000 times higher than annual safety limit detected outside Reactor 2 vessel

Photo : Drone exploring over the cover of Reactor 2 PCV by Nuclear Regulation Authority [URL]   On the 8th of September, 2021, Nuclear Regulation Authority announced that a drone

Breaking news Contaminated water crisis Fukushima Plant

Most of the exhaust filters found breached in contaminated water processing system

Photo : A drone attempting to inspect the radiation level on the cover of primary containment vessel of Reactor 2 by Tepco   Following up this article : Tepco halted

Breaking news Contaminated water crisis Fukushima Plant

Tepco halted contaminated water processing as exhaust filters breached

Photo : The breached exhaust filter in ALPS by Tepco   On the 2nd of September, 2021, Tepco announced the exhaust filters attached to the contaminated water processing system were

Breaking news Fukushima Plant Plant hazard

The number of Covid-19 cases hit highest since last year in Fukushima plant

Photo : Inside PCV (Primary container vessel) in Reactor 2. [Link]    Covid-19 is increasingly spreading among the decommissioning workers in the Fukushima nuclear plant. Since three workers were confirmed

Column

Not ended yet

One day, anyone comes to a point in their life. We have to decide to live as a victim or someone new. Living as a victim is easy. Self-pity hides

Breaking news Contaminated water crisis Fukushima Plant

Tepco redefined Processed water as Processed water et cetera. 70 percent not processed enough.

Photo : The Inside of Reactor 2 in June, 2021 by Tepco [Link]   Tepco and the government of Japan are planning to discharge the filtered contaminated water to the

Breaking news Environmental contamination Fukushima Plant

Radioactive material released from Fukushima plant doubled up since last year

The released amount of Cs-137 and Cs-134 from the crippled reactors in Fukushima plant reached over the double compared to the previous year. Tepco released their monthly report about the

Breaking news Confirmed effects Health

Another Fukushima worker died, no details announced

On the daily report of 1/22/2019, Tepco briefly announced a Fukushima worker was confirmed to be dead on the previous day. The report has only 2~3 lines, none of the

Breaking news Core removing struggle Fukushima Plant

Video and photo footage of the first contact to molten core in Reactor 2

Following up this article.. Tepco contacted molten fuel in Reactor 2 yet 98 percent unknown [URL]   Video and photo footage were released by Tepco on 2/14/2019.        

Breaking news Natural disasters

Aftershocks occurred over 85 times by 11am of 23rd Nov after M7.4

Following up this article.. [Breaking] M7.3 Fukushima offshore / 3m of Tsunami is coming / Fukushima plant status unknown [URL]   According to JMA (Japan Meteorological Agency), they observed over 85