Tepco “We are not going to dam up the drain that the leaked water flowed into”

In the press conference of 9/2/2013, Tepco’s spokesman commented they don’t plan to dam up the drain around the leaking tanks.

High level of radiation is measured in the drain, which shows the leaked contaminated water flowed from the tanks into the drain.

The drain is straightly connected to the sea. Once leaked water flows into the drain, it travels to the Pacific.

http://www.tepco.co.jp/tepconews/streaming/index-j.html

 

Related article..[Possible hidden tank leakage ] All β level rising in another drain [URL]

 

You can ignore the truth but the truth won’t ignore you.

_____

Français :

Tepco : “On ne va pas obturer le canal d’évacuation par lequel la fuite est partie”

 

Au cours de la conférence de presse du 2 septembre 2013, le porte-parole de Tepco a déclaré qu’ils n’allaient pas obturer le canal d’évacuation au niveau des citernes qui fuient.

La radioactivité relevée dans ce canal est élevée, ce qui montre que les eaux extrêmement radioactives se sont écoulées dedans depuis les citernes.
Le canal est directement relié à la mer. Une fois que l’eau tombe dedans, elle part directement dans le Pacifique.

http://www.tepco.co.jp/tepconews/streaming/index-j.html

Article lié : [Fuite de citerne cachée possible] La radioactivité en β augmente dans un autre canal d’évacuation

Vous pouvez ignorer la vérité mais la vérité ne vous ignorera pas.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories

September 2013
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
30