Tepco to stop reactor3 pool coolant system for 102 hours until 7/12/2013

According to Tepco, they are going to stop the coolant system of reactor3 spent fuel pool for the instrument inspection.

It will start on 7/8/2013 and end on 7/12/2013. (102 hours)

At 11:00 of 7/5/2013, the pool temperature is 24.2℃ supposedly. Tepco states it rises at 0.137℃/h, so it would be 38.2℃, which is lower than the safety limit of 65℃.

Tepco to stop reactor3 pool coolant system for 102 hours until 7/12/2013

 

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130705_05-j.pdf

 

 

Don’t let them dominate the truth just because they have money.

_____

Français :

Tepco va arrêter le système de refroidissement de la piscine du réacteur 3 pour 102 heures, jusqu’au 12 juillet 2013

 

Selon Tepco, ils vont arrêter le système de refroidissement de la piscine des combustibles usagés du réacteur 3 pour inspection des appareils.

Ça commencera le 8 juillet 2013 et finira le 12. (102 heures)
Le 5 juillet à 11:00, la température de la piscine est soi-disant de 24,2 °C. Tepco affirme qu’elle monte de 0,137 °C/h, donc elle ira jusqu’à 38,2 °C, ce qui reste en dessous de la limite de sécurité des 65 °C.

Tepco to stop reactor3 pool coolant system for 102 hours until 7/12/2013

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130705_05-j.pdf

Ne les laissez pas dominer la vérité juste parce qu’ils sont riches.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories