Contaminated groundwater level coming up due to the impervious wall

Related to this article..[Column] What is so serious about finding the highly contaminated water underground ? [URL]

In order to stop the contaminated groundwater flowing to the sea, Tepco is building the impervious wall underground.

At the moment of 7/27/2013, 58% of the wall is completed. Tepco plans to have it completed by 8/10/2013.

On 7/29/2013, Tepco released the report of the groundwater level and sea water level.

The data shows the groundwater level of the boring No.1 is increasing since they started the construction on 7/8/2013.

The boring No.1 is surrounded by the wall, stopped groundwater is accumulated in the area. Tepco hasn’t announced how they are going to treat the retained water.

Contaminated groundwater level coming up due to the impervious wall

 

2 Contaminated groundwater level coming up due to the impervious wall

 

Related article..[Column] Accumulated groundwater may overflow to up-ground in early August [URL]

 

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130729_05-j.pdf

 

 

Truth is not truth because everyone believes in it. It’s the truth because it’s consistent and can’t be rebutted.

_____

Français :

Le niveau des eaux souterraines monte à cause du mur étanche

 

Article lié : [Édito] Qu’y a-t-il de si grave à trouver des eaux souterraines aussi radioactives ?

Tepco construit un mur souterrain étanche pour empêcher les eaux souterraines extrêmement radioactives de s’écouler en mer.

Au 27 juillet 2013, 58% du mur est construit. Tepco prévoie de le terminer pour le 10 août 2013.
Le 29 juillet 2013, Tepco publie un rapport sur les niveaux des eaux souterraines et de la mer.
Les données montrent que le niveau des eaux souterraines du forage n°1 monte depuis qu’ils ont commencé la construction le 8 juillet 2013.
Le forage n°1 est entouré par le mur, les eaux bloquées s’accumulent dans cette zone. Tepco n’a pas annoncé comment ils allaient traiter les eaux bloquées.

Contaminated groundwater level coming up due to the impervious wall
2 Contaminated groundwater level coming up due to the impervious wall

Article lié : [Édito] Les eaux souterraines pourraient s’accumuler à ressurgir en surface dès début août

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130729_05-j.pdf

Ce n’est pas la vérité parce que tout le monde y croit. C’est la vérité parce que c’est cohérent et irréfutable.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories