Tag "steam"

Back to homepage
Uncategorized

Reactor3 steaming again / Over 1 Sv/h at 6 of 25 locations on the operation floor

Following up this article..[Breaking] 2.2 Sv/h from the top of reactor3, 562 mSv/h from the steam [URL] According to Tepco, the steam is still observed at 4:15 of 7/24/2013. Atmospheric

Uncategorized

[Timely] 2 of the 2 dust radiation monitoring systems down in reactor2

A few minutes ago, Tepco reported they measured 2.2 Sv/h from the top of reactor3. (cf, [Breaking] 2.2 Sv/h from the top of reactor3, 562 mSv/h from the steam [URL])

Core removing struggle

[Breaking] 2.2 Sv/h from the top of reactor3, 562 mSv/h from the steam

Following up this article..[Nothing settled] Steam from reactor3 again [URL] According to Tepco, they measured extremely high level of radiation on the top of reactor3. On 7/23/2013, Tepco measured the

Uncategorized

[Nothing settled] Steam from reactor3 again

Following up this article..Thermography shows 50℃ on operation floor of “steaming” reactor3 [URL] On 7/23/2013, Tepco announced they observed the “steam” coming out from the same location of reactor3 again.

Plant hazard

Thermography shows 50℃ on operation floor of “steaming” reactor3

Following up this article..Tepco “Steaming area of reactor3 is 18~25℃ by thermography on 7/20/2013″ [URL] From the thermography picture published on 7/22/2013, some parts are nearly 50℃ on the operation

Uncategorized

Tepco “Steaming area of reactor3 is 18~25℃ by thermography on 7/20/2013”

According to Tepco, the atmospheric temperature of of the top floor of reactor3 was 18 ~ 25 ℃ by infrared thermography. They observed something like “steam” in that area. The

Core removing struggle

Cs-134 detected from “steam” in reactor3 / Tepco “not sure if it was rain”

Following up this article..[Steaming reactor3] Tepco “The steam is the heated rain, same thing happened last year but didn’t report it” [URL] According to Tepco, the steam was not observed

Uncategorized

[Steaming reactor3] Tepco “The steam is the heated rain, same thing happened last year but didn’t report it”

Following up this article.. Tepco to hold an extraordinary press conference about reactor3 “steam” at the headquarters [URL]   The steam is still coming up at the moment of 16:00

Uncategorized

[Video] “Steam” from the top of reactor3 building

Following up this article..Steam still coming up from reactor3 at 13:20 JST / Tepco prepared to inject boric acid [URL] Around 17:00 of 7/18/2013 (JST), Tepco posted the video of

Spent Fuel Pools

Tepco to hold an extraordinary press conference about reactor3 “steam” at the headquarters

Following up this article..Steam still coming up from reactor3 at 13:00 JST / Tepco prepared to inject boric acid [URL]   According to Tepco, they are going to have an