Archive
Contaminated water crisis
Huge tanks shipped to Fukushima plant / One gets full within less than 2 days
Following up this article.. Tepco to carry new contaminated water tanks directly from the factory by transport ships [URL] Tepco started carrying 6 contaminated water tanks from
Contaminated water crisis
4,200,000,000Bq of β and 10,000,000 Bq of γ nuclides leaked from ALPS again / New technology never get into operation
Extremely high level of radiation leaked from multiple nuclide removing system ALPS (Advanced Liquid Processing System). This system has been continuously in the serious trouble since they started the hot
Contaminated water crisis
[Assumption overturned] Bypass water already exceeded the safety limit / Tepco “won’t stop pumping up”
Following up this article.. Tepco started pumping up the bypass water to discharge / Tritium density jumped up to 87% of desired safety level [URL] The tritium density already