Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards

In order to reduce the increasing groundwater on the seaside of reactor2, Tepco installed a well point and got it into the operation.

They plan to install 27 more well points.

Tepco expects the well points to pump up the water faster than the first pump, but from the photos, the equipment is laid on the vinyl sheet with sandbags. Pipes are fixed with the plywood boards.

 

Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards

2 Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards

3 Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards

Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards

2 Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards

Related article..Tepco pumped up only 20% groundwater of capacity [URL]

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130815_01-j.pdf

http://photo.tepco.co.jp/date/2013/201308-j/130815-01j.html

 

 

Truth is not truth because everyone believes in it. It’s the truth because it’s consistent and can’t be rebutted.

_____

Français :

Le point de forage pour pomper les eaux souterraines entre en action : déployé sur des feuilles de vinyle, des sacs de sable et du contreplaqué

 

Pour faire baisser le niveau des eaux souterraines du côté mer du réacteur 2, Tepco a installé un point de forage et l’a mis en opération.

Ils prévoient d’en installer 27 autres.
Tepco pense que ces points de forage pomperont plus vite que la première pompe. Selon leurs photos, leur  équipement est posé sur une feuille de vinyle tenue par des sacs de sable. les tuyaux sont fixés que des planches de contreplaqué.

Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards
2 Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards
3 Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards
Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards
2 Well point got in operation to pump up groundwater / laid on vinyl sheet and sandbag, plywood boards

Article lié : Tepco ne pompe que 20 % du débit des eaux souterraines

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130815_01-j.pdf
http://photo.tepco.co.jp/date/2013/201308-j/130815-01j.html

Ce n’est pas la vérité parce que tout le monde y croit. C’est la vérité parce que c’est cohérent et irréfutable.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories

August 2013
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031