Tag "turbin building"

Back to homepage
Uncategorized

[Reactor3 got worse than last year] 5 Sv/h on the first floor of reactor3, “3.6 times worse than last year”

On 11/27/2012, Tepco conducted robot survey on the first floor of reactor3 building. [Link] The purpose was to investigate the pipe for contaminated air from the turbin building, the pipe