Tag "groundwater"

Back to homepage
Breaking news Contaminated water crisis Fukushima Plant

Tepco to inject cement instead of frozen water wall

Related to this article.. Underground temperature never go down regardless of frozen wall beside common fuel pool [URL]   On 6/2/2016, Tepco reported to NRA (Nuclear Regulation Authority) that they need

Breaking news Contaminated water crisis Fukushima Plant

Sr-90 density jumped up over 10 times in groundwater beside Reactor 2

On 2/5/2016, Tepco reported Strontium-90 density spiked 1,103% in groundwater beside Reactor 2. The sample was collected between the plant port and Reactor 2. The sampling well is one of

Breaking news Cover-ups Fukushima Plant

Underground wall nearly doubled the increasing speed of retained water in plant buildings

Following up this article.. Increasing groundwater is “bulging” the coastal area of Fukushima plant after building underground wall [URL]   On 12/18/2015, Tepco reported to NRA (Nuclear Regulation Authority) that the

Breaking news Contaminated water crisis Fukushima Plant

Tepco considers evaporating 800,000 m3 of Tritium water to the air

On 12/11/2015, Tepco announced the possibility of evaporating Tritium water retained in Fukushima plant area. It was reported in the task force of METI (Minister of Economy, Trade and Industry).

Breaking news Contaminated water crisis Fukushima Plant

Sr-90 density spiked 170 percent at an observation well beside Reactor 2

On 12/15/2015, Tepco reported the Strontium-90 density jumped up at one of the observation wells near Reactor 2. This well is to detect the radiation level in groundwater, situated between

Breaking news Fukushima Plant Plant hazard

Increasing groundwater is “bulging” the coastal area of Fukushima plant after building underground wall

The completed underground wall is increasing the groundwater level to crack the pavement and pushing the wall itself toward the sea, according to Tepco. On 10/26/2015, Tepco completed the underground

Breaking news Contaminated water crisis Fukushima Plant

[Photo] Tepco reports groundwater stopped flowing into Reactor 1 at one of the ducts

On 11/12/2015, Tepco announced that at a control cable duct they observed groundwater stop flowing into Reactor 1 turbine building. They didn’t report if groundwater keeps flowing into the building from

Breaking news Contaminated water crisis Fukushima Plant

7,200,000,000 Bq of All β nuclides in contaminated water leaked from Reactor 2

On 11/5/2015, Tepco announced the retained water in Reactor 2 building was found leaking on transferring. From Tepco’s report, the leaked volume was approx. 0.23 m3. The leakage detector went

Breaking news Contaminated water crisis Fukushima Plant

Sr-90 density increased over 2.5 times in groundwater beside Reactor 2

On 10/30/2015, Tepco announced the Strontium-90 density reached the highest level at one of the observation wells beside Reactor 2. The sample groundwater was collected at the observation well called

Breaking news Contaminated water crisis Fukushima Plant

Tritium density in one of the bypass wells keeps increasing since this August

Related to this article.. Approx. 84,000 m3 of contaminated groundwater has been discharged to the Pacific from bypass wells [URL]   From Tepco’s report released on 10/7/2015, Tritium density has been