Tag "reactor building"

Back to homepage
Breaking news Cover-ups Fukushima Plant

Tepco admitted uneven settlement in Fukushima plant

On 11/5/2015, Tepco reported they surveyed the uneven settlement in Fukushima plant. It has been known that the entire plant area sank approx. by 700 mm after 311, however the

Column Contaminated water crisis

[Column] Groundwater contamination ~The more serious catastrophe than sea contamination

High level of radiation is measured from groundwater and seawater in Fukushima nuclear plant. Though Tepco doesn’t admit it’s flowing to the sea, most probably it’s already going to the

Uncategorized

Tepco doesn’t know where ground water flows into, “try to dump water gauge in”

It is estimated that 400 tones of water flows into the plant everyday. On 5/24/2013, Tepco announced they are going to “install” the water gauge into reactor1~3 related buildings to

Core removing struggle Cover-ups

Fractured fuel may be in suppression chamber and reactor building, No technology to identify, No governmental policy

According to the minutes of mid/long term Fukushima measures R&D meeting held on 10/22/2012, Tepco is aware of the fact that fractured fuel debris has moved to the suppression chamber