Tag "SFP"

Back to homepage
Breaking news Fukushima Plant Plant hazard

Coolant system of SFP3 in Fukushima DAINI got automatically suspended / 2544 fuel assemblies stocked

According to Tepco, Fukushima DAINI‘s spent fuel pool of Reactor 3 had its coolant system suspended automatically. It stocks 2,360 spent fuel assemblies and 184 new fuel assemblies. No more

Breaking news Fukushima Plant Spent Fuel Pools

[Photo] Tepco reported 2 fuel assemblies have the handles deformed in pool of Reactor 3

On 10/16/2015, Tepco announced they confirmed the handle parts of 2 fuel assemblies are deformed in SFP 3 (Spent Fuel Pool of Reactor 3).   Tepco reports they removed a

Breaking news Fukushima Plant Spent Fuel Pools

Tepco leaked oil from hydraulic hose into SFP of Reactor 3

On 9/3/2015, Tepco announced they leaked oil into SFP 3 (Spent Fuel Pool of Reactor 3) around 8AM of the day. According to Tepco, hydraulic hose got hit by curing

Breaking news Cover-ups Fukushima Plant

[Video] Tepco’s new video shows there are more large debris on the deformed fuel assemblies

Following up this article.. 4 fuel assemblies found deformed after removing the debris in SFP of Reactor 3 [URL]   On 8/5/2015, Tepco released the video of their SFP 3 (Spent

Breaking news Cover-ups Fukushima Plant

Another Fukushima worker died after leaving the frozen wall area / Tepco “the cause of death is not identified”

On 8/3/2015, Tepco reported that another Fukushima worker died 2 days before. The worker was male in 30s. He worked from 6am to 9am for the frozen water wall project

Breaking news Fukushima Plant Spent Fuel Pools

4 fuel assemblies found deformed after removing the debris in SFP of Reactor 3

Following up this article.. Tepco released the video and photos to remove debris from SFP 3 [URL]   On 8/4/2015, Tepco announced they found 4 fuel assemblies deformed in SFP 3

Breaking news Fukushima Plant Spent Fuel Pools

Tepco released the video and photos to remove debris from SFP 3

Following up this article.. Tepco completed removing 20 t debris from SFP 3 [URL]   On 8/2/2015, Tepco released the video and photos of the debris removal from SFP 3 (Spent

Breaking news Fukushima Plant Spent Fuel Pools

Tepco completed removing 20 t debris from SFP 3

Following up this article.. Tepco to start removing the largest debris from Reactor 3 pool / Worker “The most dangerous process” [URL]   Tepco announced they completed removing the fuel handling machine

Breaking news Fukushima Plant Spent Fuel Pools

Tepco to start removing the largest debris from Reactor 3 pool / Worker “The most dangerous process”

Following up this article.. Fuel Handling Machine potentially opening the door of SFP3 to the reactor vessel [URL]   On 7/25/2015, the former Fukushima worker “Happy11311″ posted on Twitter that Tepco

Breaking news Fukushima Plant Spent Fuel Pools

Tepco announced to postpone fuel removal from SFP of Reactor 1 – 3 up to over 3 years

On 6/12/2015, Tepco announced they are going to postpone fuel removal from SFP (Spent Fuel Pool) of Reactor 1 – 3. From their revised plan, the fuel removal from SFP