Tepco to complete building the impervious wall on the seaside of reactor2 today

Following up this article..Tepco started pumping up the rising groundwater on the seaside of reactor2 [URL]

According to Tepco, the impervious wall on the coastal line is going to be completed on 8/9/2013.

They have been injecting the chemical material on the seaside of reactor2 since 7/8/2013.

It consists of the double lines. The second line on the land side has 114 underground structures.

 

Tepco to complete building the impervious wall on the seaside of reactor2 today

 

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130809_05-j.pdf

 

 

Truth is not truth because everyone believes in it. It’s the truth because it’s consistent and can’t be rebutted.

_____

Français :

Tepco termine aujourd’hui la construction du mur étanche le long de la rive en face du réacteur 2

 

Article lié : Tepco a commencé le pompage des eaux souterraines sur le côté mer du réacteur 2

Selon Tepco, le mur étanche le long du rivage sera terminé le 9 août 2013.
Ils injectent la substance chimique à l’Est du réacteur 2 depuis le 8 juillet 2013.
Il est constitué en double ligne. La seconde ligne côté terre contient 114 structures souterraines.

Tepco to complete building the impervious wall on the seaside of reactor2 today
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130809_05-j.pdf

Ce n’est pas la vérité parce que tout le monde y croit. C’est la vérité parce que c’est cohérent et irréfutable.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories

August 2013
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031