Tag "truss"
The progress of debris removal from SFP of reactor3
Following up this article..Minor debris removed from SFP of reactor3 [URL] http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130206_01-e.pdf Iori Mochizuki _____ Français : La progression du retrait des débris de la
Minor debris removed from SFP of reactor3
On 2/4/2013, Tepco reported they removed the minor debris from SFP of reactor3. The removal of steel truss debris is planned for early February but it’s not started yet. http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130204_01-e.pdf
Third steel beam found beside the fuel rack. Tepco “Fuel assemblies may be damaged”
As to the latest accident in reactor3, Fukushima Diary reported Tepco found 2 steel beams in SFP3. (cf. [Reactor3] Underwater video, “Two steel beams were found in the pool”) After
Tepco released reactor3 related information in English one day later than Japanese version
As to the latest accident in reactor3, Tepco released the English version of the information. Fukushima Diary reported the Japanese version of the document on 9/24/2012. (cf. Videos of SFP
[Reactor3] Underwater video, “Two steel beams were found in the pool”
On 9/22/2012, Tepco dropped 7m of the steel beam into SFP3. (cf. Rainwater flows into SFP of reactor3) On 9/25, Tepco released 3 videos taken by the underwater camera. They