Tag "temperature"

Back to homepage
Uncategorized

Tepco secretly increased the water amount to reactor2

Following up this article ..Possibility of reactor 2 to have gone 200℃ Tepco secretly increased the water amount to inject to reactor2. Having the heating gauge indicate extreme temperature, Tepco

Uncategorized

Possibility of reactor 2 to have gone 200℃

Following up this article ..Possibility of Tepco to have broken the heating gauge on purpose The heating gauge at CRD housing is showing the increasing trend still. This gauge has

Uncategorized

Possibility of Tepco to have broken the heating gauge on purpose

  Following up this article..Another heating gauge is showing increasing temperature The heating gauge of CRD housing has been showing the same trend of temperature as the broken heating gauge.

Uncategorized

Jap Gov declared cold shutdown without measuring neutron ray

  Though Tepco stated they could not measure neutron ray in November, Tepco turned out to have no equipment to know if recriticality is going on by measuring neutron ray.

Core removing struggle

Unbroken heating gauges are only 2

  Tepco announced there are only 2 heating gauges which they think are not broken out of 40 heating gauges. Though they have been criticizing that “meltdown” is a fear

Uncategorized

Minamisoma blogger “The heating gauge is not broken at reactor2”

The Minamisoma blogger wrote about reactor 2. She comments reactor2 is actually being heated. <Quote> いま、 「 作業員 さん 」 と 「 (元)作業員 さん 」 に、電話で確認をした。 Now I talked on the phone with

Uncategorized

Another heating gauge is showing increasing temperature

Following up this article ..Heating gauge was lost Tepco is asserting the heating gauge set on the bottom of the reactor is broken because other 2 gauges are showing 31~34℃.

Uncategorized

Heating gauge was lost

In the press conference of 2/13 PM, Tepco announced they lost the heating gauge of reactor 2. Reactor 2 marked 93.7℃ at 2/13/2012 11:00, but it went to 276.4℃ at

Uncategorized

Fukushima local gov requested Tepco to update every 1 hour

Though NISA suggested it was just broken heating gauge, Fukushima local government required Tepco to inform them of the temperature of the reactor every one hour. They also requested Tepco

Uncategorized

90℃ in reactor2. Emergency press conference of NISA [Live]

Reactor2 marked 90℃. NISA held  an emergency press conference at 19:00 in JST. They even skipped emergency mail to journalists. NISA is still suspecting it’s because the heating gauge is