Tag "scope"

Back to homepage
Core removing struggle

[Elephant foot ?] Tepco collected highly radioactive sediment in reactor2 PCV, “0.2 Sv/h of γ and β”

On 7/8/2013, Tepco conducted the soundness inspection of reactor2 TIP guide pipe. This is their second attempt. They failed in the first attempt (2/25 ~ 2/28/2013) to have 4 fiberscopes