Tag "reactor 5"

Back to homepage
Breaking news Core removing struggle Fukushima Plant

Tepco started transferring Reactor 5 fuel assemblies to SFP

On 4/21/2015, Tepco announced they would start transferring fuel assemblies from Reactor 5 to SFP (Spent Fuel Pool) of Reactor 5 on 4/22/2015. Reactor 5 had 548 fuel assemblies in

Breaking news Core removing struggle Fukushima Plant

Refueling machine of Reactor 5 malfunctioned

The refueling machine of Reactor 5 malfunctioned on 12/4/2014. Tepco has difficulties to remove fuel even from an uncrippled reactor.   The alarm of low air pressure went off when they

Fukushima Plant Plant hazard Spent Fuel Pools

Reactor 5 pool without coolant system leaked its coolant water

Photo : Leaked SFP 5 water before pumped up.   According to Tepco, SFP 5 (Reactor5 Spent Fuel Pool) leaked its coolant water on 7/19/2014.   Unidentified water was found

Spent Fuel Pools

SFP of reactor 3 and reactor 5 are heated as well

Following up this article ..Attention : Reactor 2 is still being heated It’s not only reactor 2, which is being heated. According to the plant parameter data of Tepco, the