Tag "rat"
“Small animal” caused the power trouble in Fukushima plant again / Dung as evidence
Note : If you are from the international mass media, Don’t read this site before taking a contact with me. Fukushima nuclear plant has had the power trouble
[Again] Charger panel in Fukushima Daini disordered due to a rat
According to Tepco, their charger panel of the air-cooled gas turbine generator vehicle in Fukushima Daini was disordered due to a rat again. Before noon of 7/2/2013, the alarm
Tepco stopped coolant system of SFP reactor2 for finding TWO rats in power transformer
According to Tepco, they stopped the coolant system for spent fuel pool of reactor2 for 4 hours. At 10:13 of 4/22/2013 (JST), the patrol team from Fukushima plant reliability improvement
The coolant system of reactor3 SFP back on, “No back-up system installed yet ?”
According to Tepco, the coolant system of reactor3 SFP was restarted at 17:20 of 4/5/2013 (JST). (cf, [Breaking] Coolant system of reactor3 SFP stopped, Tepco is investigating the reason [URL])
[Power stoppage] Tepco sounds serious, “Electric shock mark was found on the dead mouse”
The power stoppage of 3/18/2013 was caused by the rat in the panel board supposedly. On 3/25/2013, Tepco released the report about the progress of the investigation. In this
15μSv/h from the rat caught in Fukushima plant
The power stoppage on 3/18/2013 was caused by a rat in the temporary panel board supposedly. (cf, The blackout was caused by a mouse in the panel board, the board
Tepco released the report about the panel board and the mouse in English
Fukushima Diary reported “The blackout was caused by a mouse in the panel board, the board has been left on the truck since 3/18/2011 [URL]” on 3/20/2013. On 3/21/2013,
The blackout was caused by a mouse in the panel board, the board has been left on the truck since 3/18/2011
According to Tepco, the power blackout of Fukushima plant was caused by a mouse that came in the terminals to have caused a short circuit. The panel board was provisionally
[Express] Rats breeding in Fukushima plant
Actual Fukushima worker Happy 11311 tweeted rats are breeding in Fukushima plant. He concerns they might bite some cables. オイラ動物は好きな方だけど、ネズミとは今まで接点がなかった。最近は現場のあちこちでネズミを見かけるようになった。ミッキーやミニーなら可愛いけどそんな感じは微塵も感じられないでし(>_<)オイラの知ってるジェリーよりはるかにデカいし。ケーブルかじってトラブルないといいんだけど… — ハッピーさん (@Happy11311) 12月 20, 2012 <Translate> I like