Tag "power blackout"
Tepco released the report about the panel board and the mouse in English
Fukushima Diary reported “The blackout was caused by a mouse in the panel board, the board has been left on the truck since 3/18/2011 [URL]” on 3/20/2013. On 3/21/2013,
The blackout was caused by a mouse in the panel board, the board has been left on the truck since 3/18/2011
According to Tepco, the power blackout of Fukushima plant was caused by a mouse that came in the terminals to have caused a short circuit. The panel board was provisionally
[Power blackout] Coolant system of common pool restarted
Following up this article..”[Power blackout] Coolant system of reactor1,3 &4 restored, common pool to be back on by 8AM of 3/20/2013 [URL]” According to NHK, Tepco restarted the coolant system
[Power blackout] Coolant system of reactor1,3 &4 restored, common pool to be back on by 8AM of 3/20/2013
From the sudden power blackout of Fukushima plant at 18:57 of 3/18/2013, the coolant system of reactor1, 3, 4 and the common pool were stopped. At 14:20 3/19/2013 (JST), the
[Analysis] The sudden blackout revealed the weakness of Fukushima plant, “Reactor4 has 4 days to go”
In the evening of 3/18/2013, Fukushima plant had the power blackout and the coolant system of reactor1, 3 and 4 lost power. (cf, [Breaking] Power blackout in Fukushima plant, coolant
The radioactive density of SFP of reactor 1 is 24 billion Bq/m3, 5266 times much as reactor4
From the power blackout since 18:57 of 3/18/2013, the coolant system of the spent fuel pool of reactor1, 3 and 4 have been stopped. (cf, [Breaking] Power blackout in Fukushima