Tag "panel board"

Back to homepage
Spent Fuel Pools

The coolant system of reactor3 SFP back on, “No back-up system installed yet ?”

According to Tepco, the coolant system of reactor3 SFP was restarted at 17:20 of 4/5/2013 (JST). (cf, [Breaking] Coolant system of reactor3 SFP stopped, Tepco is investigating the reason [URL])

Spent Fuel Pools

The blackout was caused by a mouse in the panel board, the board has been left on the truck since 3/18/2011

According to Tepco, the power blackout of Fukushima plant was caused by a mouse that came in the terminals to have caused a short circuit. The panel board was provisionally