Tag "impervious wall"

Back to homepage
Breaking news Cover-ups Fukushima Plant

Groundwater level still keeps going up in seaside of Reactor 2

Following up this article .. Groundwater coming up in seaside of Reactor 2 again / Overflowing up-ground around 18th December [URL]   The groundwater level still keeps increasing as it

Breaking news Contaminated water crisis Fukushima Plant

Groundwater coming up in seaside of Reactor 2 again / Overflowing up-ground around 18th December

The groundwater level is observed to be coming up at least in 4 borings in seaside of Reactor 2. Fukushima Diary found the trend in Tepco’s data released on 11/14/2014.

Breaking news Contaminated water crisis Fukushima Plant

Highest density of Tritium measured from seawater of all of the crippled reactors even outside of underground wall

    On 6/27/2014, Tepco announced they measured the highest density of Tritium from Fukushima plant port. The sample seawater was taken in water intake of Reactor1, 2, and 3&4,

Contaminated water crisis Environmental contamination

All β nuclide density in reactor2 groundwater 1,000 times much as before Feb / 10 times much in plant port too

All β nuclide (including Strontium-90) density in groundwater jumped up by 1,000 times since this February, according to Tepco. It is from Tepco’s report about groundwater contamination released on 6/6/2014.

Contaminated water crisis Cover-ups Plant hazard

Tritium density of reactor2 seaside became the highest since last November / 270,000,000 Bq/m3

Note : Thank you for reading Fukushima Diary. Fukushima Diary is genuinely supported by your donation. Monthly recurring donation is also appreciated.     Related to this article.. Highly contaminated

Contaminated water crisis Cover-ups Plant hazard

Tepco “Seaside of the reactors is getting too radioactive to work”

Note : If you are from the international mass media, Don’t read this site before having a contact with me.     Tepco stated the seaside of reactors are getting

Contaminated water crisis Cover-ups Sea contamination

Groundwater level found sync with ebb and flow of the sea → Tepco to abandon the measuring point, “Not credible data”

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Following up this article.. [Impervious wall broken ?]

Contaminated water crisis

Groundwater level rising at 800m from the coastal line

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Related to this article.. Tepco gave up pumping

Contaminated water crisis Sea contamination

Groundwater level of more area starting to be in sync with ebb and flow of the sea

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Following up this article.. [Impervious wall broken ?]

Contaminated water crisis Cover-ups Plant hazard

Fukushima plant radiation increasing due to the rising contaminated groundwater / “Covering with lead plate”

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Related to this article.. Tepco gave up pumping