Tag "debris"

Back to homepage
Cover-ups

Tepco “Molten fuel may be in various parts of reactor, takes up to 35 years to remove, international help is needed”

On 2/21/2013, Tepco released their report that was submitted to IEM held by IAEA from 1/27 to 2/1/2013. In this report, Tepco admitted, they cannot deny the possibility that molten

Effects to be confirmed

[Express] Clinic “Hay fever patients have nosebleed since last month, it has never happened before”

Introducing important tweets as [Express] for simultaneous updates.   <Translate> A clinic in Chuoku Osaka said, the cases that hay fever patients have nosebleed have been increasing since the end

Uncategorized

920 mSv/h from the basement floor of reactor1, “Is fractured fuel debris in S/C ?”

On 2/20/2013, Tepco investigated inside of torus room of reactor1. [URL 1] Torus room is where the facility called S/C (suppression chamber) is located. S/C is a part of the

Uncategorized

[Express] Yamamoto Taro “Since Osaka started incinerating debris, my mother has been sick”

Introducing important tweets as [Express] for simultaneous updates.   <Translate> Since debris incineration was started in Osaka, my mom has been having the health problems. Depression, headache, a lot of

Uncategorized

Niigata governor “Debris incineration is almost murder”

  In the press conference of 2/14/2013, Niigata prefectural governor Izumida criticized the debris incineration in Kishiwazaki city and Sanjo city to comment “It’s almost murder to incinerate disaster debris

Spent Fuel Pools

Tepco investigated inside of SFP3, “The debris didn’t contact the fuel storage rack”

On 2/8/2013, Fukushima Diary reported “Tepco dropped the fuel handling machine mast to SFP of reactor3 when removing the debris” [URL 1] On 2/13/2013, Tepco investigated inside of the SFP

Spent Fuel Pools

Tepco dropped the fuel handling machine mast to SFP of reactor3 when removing the debris

Tepco has been removing the minor debris from SFP of reactor3. [URL 1] [URL 2] During the removal task on 2/6/2013, Tepco dropped a part of the debris called fuel

Spent Fuel Pools

The progress of debris removal from SFP of reactor3

Following up this article..Minor debris removed from SFP of reactor3 [URL]       http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130206_01-e.pdf     Iori Mochizuki _____ Français : La progression du retrait des débris de la

Uncategorized

Former minister of Environment, Hosono had his daughter die of a premature birth, “6 months earlier, weighed 700g”

The former minister of Environment from DPJ, Hosono commented his daughter died of premature birth. She was supposed to be born in June. 2013, but she was born last December

Spent Fuel Pools

Minor debris removed from SFP of reactor3

On 2/4/2013, Tepco reported they removed the minor debris from SFP of reactor3. The removal of steel truss debris is planned for early February but it’s not started yet. http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130204_01-e.pdf