Tag "bypass"

Back to homepage
Contaminated water crisis Sea contamination

Tepco’s vice president “We are eager to implement groundwater bypass plan”

Following up this article..Tepco’s vice president “Tritium got into groundwater certainly” [URL]   Having Tritium density increasing upstream of the groundwater stream, Tepco’s vice president Aizawa commented in the press

Contaminated water crisis Sea contamination

Tepco’s vice president “Tritium got into groundwater certainly”

Following up this article..64,000,000 Bq/m3 Tritium in groundwater besides leaked tank / 15 times much as 2 days before [URL]   In the press conference of 9/11/2013, Tepco’s vice president

Contaminated water crisis Environmental contamination Sea contamination

Tepco to discharge bypass groundwater to “outside” of Fukushima plant port

Related to this article..[Photo] Leaking tank drain goes to outside of Fukushima plant port [URL]   In order to reduce the groundwater volume to treat, Tepco is planning to pump

Column Contaminated water crisis Environmental contamination Sea contamination

[Column] Summary of Fukushima – How to minimize the risk

    Tones of the groundwater flow to Fukushima nuclear plant. Now the plant is the unstoppable contaminated water producing machine. Here I’d like to explain the feasibility of the

Contaminated water crisis

Tritium 450,000 Bq/m3 → 900,000 Bq/m3 in bypass well / Leaking tank effect

Having 300m3 of highly contaminated water leak, Tepco is investigating the effect of groundwater. Tepco plans to pump up the groundwater to discharge before it reaches the reactor buildings, but

Column Contaminated water crisis Sea contamination

[Column] Know before newspaper writes- Groundwater bypass is a dangerous performance

The world must be prepared for the next stage of Fukushima plant. Soon they will have to remember everything that has happened.   Just after 311, Japanese government flew the

Column Contaminated water crisis Sea contamination

[Column] Kamikaze and contaminated water

  On 8/8/2013, Tepco released a shocking report. Tepco’s planning to “bypass” the groundwater to the sea, which is supposed to be the last hope, but it is anticipated that

Contaminated water crisis Sea contamination

Groundwater bypass would gather additional 600 tones / day of groundwater from surrounding area

1,000 tones of groundwater flows to Fukushima plant area. In order to reduce this volume, Tepco is planning to pump up groundwater on the mountain side and discharge it to

Contaminated water crisis

Tepco mis-measured radiation, 610 Bq/m3 of Cs-134/137 detected from bypass well water in the second test

According to Tepco, 610 Bq/m3 of Cs-134/137 was measured from bypass well water. The sampling date was 4/16/2013. Tepco was planning to discharge the water to the sea. In the

Contaminated water crisis

The leaking highly contaminated water may collapse Tepco’s countermeasure for ground water

Having 400 tones of ground water flow into the plant everyday, Tepco is planning to control the water volume by using the bypass. They made 12 holes upstream of the