Tag "breaking"

Back to homepage
Contaminated water crisis Sea contamination

[Breaking] JP Gov admitted 300 tones of contaminated water flows to the Pacific every single day

The Agency of Natural Resources and Energy belonging to Ministry of Economy, Trade and Industry announced 300 tones of contaminated water flows to the Pacific everyday. It is not clear if

Core removing struggle

[Breaking] 2.2 Sv/h from the top of reactor3, 562 mSv/h from the steam

Following up this article..[Nothing settled] Steam from reactor3 again [URL] According to Tepco, they measured extremely high level of radiation on the top of reactor3. On 7/23/2013, Tepco measured the

Plant hazard

[Breaking] Tepco “Steam / Gas coming up from the top of reactor3, ambient dose and dust not verified”

According to Tepco, steam / gas was observed on the top of reactor3. At 8:20 AM of 7/18/2013, a subcontract worker found steam / gas coming up from the middle

Uncategorized

[Breaking] Ministry of the Environment in Japan considers suing Tepco

Ministry of the Environment in Japan considers suing Tepco. Details are not announced yet.   https://twitter.com/47newsGlobal/status/340774924044075008     Iori Mochizuki Fukushima Diary’s server cost, legal consultation cost, and other maintenance

Contaminated water crisis

[The worst senario] Extremely highly contaminated water leaking to underground, emergency press conference soon

By this January, 96% of contaminated water storage facility was full. They made 4 holes underground and has been using them for the emergency water storage facility. (cf. Tepco plans

Spent Fuel Pools

[Breaking] Power blackout in Fukushima plant, coolant system of the pools in reactor 1,3,4 lost power

According to Kyodo, power blackout took place in Fukushima plant. The coolant system of the spent fuel pools in reactor1, 3, 4 are stopped. Details are not announced yet.