Tag "1Sv/h"

Back to homepage
Uncategorized

1Sv/h on the first floor of reactor3

On 11/26/2012, Tepco published the report of “Unit 3 PCV Gas Control System Duct Inspection at Fukushima plant”. In the report, it is stated that the atmospheric dose on the first