Archive

Back to homepage
Uncategorized

Tepco can’t even investigate why ALPS stopped purifying contaminated water / Too radioactive to study

Following up this article.. 21 tanks and 1km of pipe must be decontaminated due to the system failure of ALPS / Not known when to reboot ALPS [URL]   Tepco

Uncategorized

There is 1m gap on the ground of reactor1 seaside

On the seaside of reactor1, there is a gap of level on the ground.   A freelance journalist mentioned this in Tepco’s press conference of 4/2/2014. The height of the

Column

[Column] “How to increase the amount of monthly donation ?”

Although some of the readers are canceling their monthly donation, other readers kindly ask me how to increase the value of monthly donation sometimes.   From what I’ve seen, the

Spent Fuel Pools

[Mystery] Tepco “We haven’t injected seawater to Spent fuel pool of reactor1”

On 4/1/2014, Tepco stated they haven’t injected seawater into SFP1 (Spent Fuel Pool of reactor1) since 311.   It was stated in their report about the desalination equipment installation into

Contaminated water crisis Sea contamination

Tepco doesn’t analyze the Pacific seawater in the east of Fukushima plant outside of 30km radius area

  Tepco doesn’t take seawater samples in the east of Fukushima plant from Tepco’s own report.   On 4/1/2014, Tepco released the sampling plan of the Pacific seawater. From this

Column

[Column] I’m in Cyprus now.

(This is the English ver. of this column)   Before a week passed since I came back from Netherlands, I flew from Bucharest to Cyprus. This is the latter half

Contaminated water crisis Sea contamination

[Coincidence ?] 3 highest densities of Tritium are “exactly 1,200,000 Bq/m3” in groundwater bypass

Following up this article.. Fukushima fishery cooperative gave Tepco the approval to discharge bypassed groundwater to the sea [URL]   The 3 highest readings of Tritium density are exactly 1,200,000

Uncategorized

Tepco newly employed 380 graduates as “front‐line soldiers for reconstruction of Fukushima” (Not an April fool joke)

↑ From Tepco’s facebook page [URL]   Tepco newly employed 380 graduates, they announced on 4/1/2014. This is not an April fool joke. They state this is for the reconstruction