Following up this article ..Tepco secretly increased the water amount to reactor2
Tepco started decreasing the water amount to inject to reactor2 from the night of 2/19, but
the heating gauge attached at RPV bellows seal, which is on the top of the container vessel is showing the temperature rapidly increasing.
Until the night of 2/19, Tepco was injecting 17.6 m3/h but it was decreased to 10 m3/h on 2/22.
The temperature went over 100℃ on that day.
Iori Mochizuki