Tag "suppression chamber"

Back to homepage
Breaking news Cover-ups Fukushima Plant

Crawler inspector found extremely radioactive “something” on the bottom of suppression chamber Reactor2

On 9/30/2014, Tepco published the video record of Reactor2 taken by the crawler inspector. It is a part of the coolant system, “S/C (suppression chamber)” of Reactor2. The inspector robot

Contaminated water crisis

[Video] Inside Reactor1 torus room, leakage point not identified

              Tepco investigated Reactor1’s torus room on 6/11/2014. Torus room is where to contain the donut-shaped coolant facility of the reactor. This May, Tepco

Core removing struggle

2.4 Sv/h on the basement floor of reactor1

↑ 2.4 Sv/h was measured around this point.     ↑ Steel plate lay over the aisle.   Following up this article.. [Video] Tepco identified a leaking part on reactor1

Contaminated water crisis Core removing struggle

[Video] Tepco identified a leaking part on reactor1 vessel / Pipes are rusted and starting deteriorated

  ↑ The leaking part on the pipe connected to reactor1 vessel     Following up this article.. [Video] Reactor1 confirmed leaking out the coolant water / 2.0 Sv/h [URL]

Uncategorized

Evidence to prove reactor2 also possibly exploded in 311 was found / Hole on suppression chamber

Note : Thank you for reading Fukushima Diary. Fukushima Diary is genuinely supported by your donation.Monthly recurring donation is also appreciated. On 1/30/2014, Tepco announced there is a hole on

Contaminated water crisis Core removing struggle

[Video] Reactor1 confirmed leaking out the coolant water / 2.0 Sv/h

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Fukushima Diary has been suggesting the possible direct

Uncategorized

Tepco “Suppression chamber of reactor2 is more deteriorated than expected”

Still it’s not known what happened in reactor2 when 311 took place. On 9/20 and 9/24/2013, Tepco attempted investigating the water level inside of suppression chamber by using the ultrasonic

Contaminated water crisis Core removing struggle

Tepco considers to fill Torus room with grout to stop ground water flowing in

On 5/30/2013, Fukushima Diary reported “Tepco to consider freezing ground for 1400m to stop ground water flowing into the plant [URL]” Additionally, the committee of experts suggested Tepco to fill

Core removing struggle

[Mysterious reactor2] Tepco couldn’t purge hydrogen gas from suppression chamber

Tepco injected nitrogen gas into the suppression chamber of reactor2 from 5/14 to 5/17/2013. (cf, Tepco to start nitrogen gas injection into reactor2 for the first time, “Not knowing the

Uncategorized

[Reactor2] Air pressure of Suppression Chamber was lower than Dry Well, “can’t purge hydrogen gas”

On 5/13/2013, Fukushima Diary reported “Tepco to start nitrogen gas injection into reactor2 for the first time, “Not knowing the hydrogen gas concentration” [URL]” Tepco is attempting purging hydrogen gas