Tag "sub drain"

Back to homepage
Breaking news Contaminated water crisis Fukushima Plant

[Photo] Tepco reports groundwater stopped flowing into Reactor 1 at one of the ducts

On 11/12/2015, Tepco announced that at a control cable duct they observed groundwater stop flowing into Reactor 1 turbine building. They didn’t report if groundwater keeps flowing into the building from

Breaking news Contaminated water crisis Fukushima Plant

[Video] Tepco started discharging contaminated groundwater beside crippled reactor buildings

Following up this article.. Fukushima fishing cooperative allowed Tepco to discharge the contaminated groundwater to the sea [URL]   Tepco started discharging the contaminated groundwater to the Pacific on 9/14/2015, Tepco

Breaking news Contaminated water crisis Fukushima Plant

Fukushima fishing cooperative allowed Tepco to discharge the contaminated groundwater to the sea

Following up this article.. Tepco to pump up highly contaminated groundwater for potential discharge today / Drainage plan submitted to NRA [URL]   On 8/11/2015, Fukushima fishing cooperative officially admitted Tepco

Breaking news Contaminated water crisis Fukushima Plant

Bypass water discharge increased groundwater level in Fukushima plant

Related to this article.. Tepco announced bypass project decreased 130 t / d of water / Worker “No supportive data” [URL]   Contrary to expectation, bypass water project increased a

Breaking news Contaminated water crisis Fukushima Plant

Tepco gave up pumping up contaminated water beside 4 crippled reactors to discharge to the sea

Related to this article.. 460,000,000 Bq/m3 of Cs-134/137 detected from mountain side of Reactor 2 [URL]   Tepco is going to give up discharging the contaminated water pumped up from

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

460,000,000 Bq/m3 of Cs-134/137 detected from mountain side of Reactor 2

Extremely high level of Cs-134/137 was detected in groundwater taken beside Reactor 2, Tepco announced on 10/24/2014. The specific state of underground is not verified yet. It is groundwater taken from

Breaking news Cover-ups Fukushima Plant

Strontium-90 detected in potentially discharged water from Reactor 1 and 3

2,800 ~ 11,000 Bq/m3 of Strontium-90 have been detected from pumped water around Reactor 1 and 3, according to Tepco.   On 10/1/2014, Tepco released nuclide analysis data of groundwater.

Breaking news Cover-ups Fukushima Plant

Tepco’s own data shows filtration system cannot remove Tritium from potentially discharged water at all

Following up this article.. Tepco to pump up highly contaminated groundwater for potential discharge today / Drainage plan submitted to NRA [URL]   Tepco’s filtration system does not remove Tritium

Breaking news Environmental contamination Fukushima Plant

Fukushima fishery cooperative to let Tepco and the government explain highly contaminated water discharge plan

On 8/25/2014, Fukushima fishery cooperative decided to allow Tepco and the government of Japan give explanation about highly contaminated water discharge plan. (cf, Tepco to pump up highly contaminated groundwater

Breaking news Contaminated water crisis Fukushima Plant

Tepco to pump up highly contaminated groundwater for potential discharge today / Drainage plan submitted to NRA

Photo : Fukushima plant port on 7/18/2014   Following up this article..   Tepco plans to discharge contaminated groundwater around the reactors having bypass and frozen water wall fail [URL]