Tag "silt fence"

Back to homepage
Breaking news Cover-ups Fukushima Plant

Marine radiation monitoring post down after M7.4

Following up this article.. [Breaking] M7.3 Fukushima offshore / 3m of Tsunami is coming / Fukushima plant status unknown [URL]   In the evening of 11/22/2016, Tepco announced the radiation monitoring

Sea contamination

Seawater fence doesn’t stop contamination / Cs-134/137 levels are the same inside and outside of the fence

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     The radiation levels are the same inside and

Environmental contamination Sea contamination

Seawater fence not fixed yet / Tepco “It doesn’t work to stop contamination anyway”

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Following up this article.. Towing boat rolled up

Environmental contamination Sea contamination

Towing boat rolled up the seawater fence by the screw in Fukushima plant port

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     According to Tepco, a towing boat screwed up

Environmental contamination

Seawater fence of reactor5&6 cut off again

Note : If you are from the international mass media, Don’t read this site before taking a contact with me. A seawater fence was found cut off again by Tepco

Contaminated water crisis Environmental contamination Sea contamination

[Column] How JP Prime Minister Abe lied to IOC about sea contamination

Abe stated to IOC that the contaminated water is not spreading over the Pacific and Tokyo was selected for the host city of Olympic games of 2020. If Japanese Prime

Uncategorized

Seawater fence for reactor5&6 cut off due to high waves / Tepco “No radiation leakage”

Following up this article.. Seawater fence for reactor5&6 cut off / Can’t fix it due to the high waves for the Typhoon [URL]   In the press conference of 9/26/2013,

Environmental contamination

Seawater fence for reactor5&6 cut off / Can’t fix it due to the high waves for the Typhoon

  On 9/25/2013, Fukushima Diary reported the next typhoon was approaching Fukushima nuclear plant area. (cf, [Next typhoon approaching Fukushima] Tepco plans to transfer contaminated water back to reactor buildings

Contaminated water crisis Sea contamination

Cs-134/137 level in seawater reached the highest since April beside the highly contaminated groundwater area

High level of radioactive material is detected from the groundwater on the east side of reactor2. Tepco is building the impervious wall on the coastal line but it’s increasing the

Contaminated water crisis

Former Fukushima worker “They knew contamination flows to the sea from the very beginning”

The former Fukushima worker Happy11311 commented on Twitter that it has been clear the contaminated groundwater is flowing to the sea from the facility design.   <Translate> It has been