Tag "robot"

Back to homepage
Breaking news Core removing struggle Fukushima Plant

Tepco gave up the robot inspection of Reactor 1 this year

On 1/28/2016, Tepco announced they gave up the planned robot inspection of Reactor 1 for this year. In Tepco’s assumption, Reactor 1 is supposed to have the molten nuclear fuel

Breaking news Cover-ups Fukushima Plant

[Video] Tepco investigated equipment hatch of Reactor 3 PCV / “Next time, use robot with a smartphone”

On 9/9/2015, Tepco investigated the equipment hatch of PCV 3 (Reactor 3 PCV) with a portable camera. They reported the hatch is not leaking coolant water from the inside of

Breaking news Core removing struggle Cover-ups Fukushima Plant

[Video] Over 48 Sv/h was detected by the robot in Reactor 1 / Tepco did not officially report

Following up this article.. Tepco to abandon the second robot in Reactor 1 again / Camera went out of order due to high level of radiation [URL]   Tepco’s own video

Breaking news Core removing struggle Cover-ups Fukushima Plant

Tepco to abandon the second robot in Reactor 1 again / Camera went out of order due to high level of radiation

Following up this article.. [Video / Photo] Reactor 1 investigation result by second robot / Grating covered with blue-green stuff [URL]   On 4/20/2015, Tepco announced they are going to leave

Breaking news Core removing struggle Cover-ups Fukushima Plant

[Video / Photo] Reactor 1 investigation result by second robot / Grating covered with blue-green stuff

Following up this article.. Tepco sent the second robot to Reactor 1 [URL]   From 4/16 to 4/17/2015, Tepco published the report of the second investigation in Reactor 1 PCV (Primary

Breaking news Core removing struggle Cover-ups Fukushima Plant

Tepco sent the second robot to Reactor 1

Following up this article.. [Video/Photo] The dead robot reported 10 Sv/h in Reactor 1 / Grating covered with something like yellow glue [URL]   On 4/15/2015, Tepco announced they sent the

Breaking news Core removing struggle Cover-ups Fukushima Plant

[Video/Photo] The dead robot reported 10 Sv/h in Reactor 1 / Grating covered with something like yellow glue

Following up this article.. The first robot that entered Reactor 1 died in 5 hours [URL]   On 4/13/2015, Tepco announced the dead robot had reported it measured approx. 10 Sv/h

Breaking news Core removing struggle Cover-ups Fukushima Plant

The first robot that entered Reactor 1 died in 5 hours

Following up this article.. Tepco started stating molten fuel might be out of pedestal of Reactor 1 [URL]   On 4/10/2015, Tepco announced their first robot for Reactor 1 stopped moving after

Breaking news Cover-ups Fukushima Plant

Crawler inspector found extremely radioactive “something” on the bottom of suppression chamber Reactor2

On 9/30/2014, Tepco published the video record of Reactor2 taken by the crawler inspector. It is a part of the coolant system, “S/C (suppression chamber)” of Reactor2. The inspector robot

Contaminated water crisis

[Video] Inside Reactor1 torus room, leakage point not identified

              Tepco investigated Reactor1’s torus room on 6/11/2014. Torus room is where to contain the donut-shaped coolant facility of the reactor. This May, Tepco