Tag "reactor2"

Back to homepage
Plant hazard

Tepco is going to inject boric acid

Following up this article ..Attention : Reactor 2 is still being heated On the press conference of 2/6/2012 PM, Tepco announced they are going to add 960 Kg of boric

Uncategorized

Attention : Reactor 2 is still being heated

  Following up this article ..Temperature of reactor 2 keeps getting high Since 11:00AM of 2/5/2012, the temperature of the container vessel has increased even more. 2/5/2012 11:00AM : 68.6℃

Core removing struggle

Video of endoscope operation to reactor 2

Following up this article ..Result of endoscope operation on 1/19/2012 Tepco released the video of the operation.     Dropping water and radiation noise look like storm. Here is the

Core removing struggle

Tepco is planning to check inside of the reactor2 by endoscope on 1/19

1/17/2012, NHK reported Tepco is planning to check inside of reactor2 by using endoscope on 1/19/2012. It is to see the water level and check the temperature inside of the