Tag "reactor1"

Back to homepage
Breaking news Core removing struggle Cover-ups Fukushima Plant

[Video / Photo] Reactor 1 investigation result by second robot / Grating covered with blue-green stuff

Following up this article.. Tepco sent the second robot to Reactor 1 [URL]   From 4/16 to 4/17/2015, Tepco published the report of the second investigation in Reactor 1 PCV (Primary

Breaking news Core removing struggle Cover-ups Fukushima Plant

Tepco sent the second robot to Reactor 1

Following up this article.. [Video/Photo] The dead robot reported 10 Sv/h in Reactor 1 / Grating covered with something like yellow glue [URL]   On 4/15/2015, Tepco announced they sent the

Breaking news Core removing struggle Cover-ups Fukushima Plant

[Video/Photo] The dead robot reported 10 Sv/h in Reactor 1 / Grating covered with something like yellow glue

Following up this article.. The first robot that entered Reactor 1 died in 5 hours [URL]   On 4/13/2015, Tepco announced the dead robot had reported it measured approx. 10 Sv/h

Breaking news Core removing struggle Cover-ups Fukushima Plant

The first robot that entered Reactor 1 died in 5 hours

Following up this article.. Tepco started stating molten fuel might be out of pedestal of Reactor 1 [URL]   On 4/10/2015, Tepco announced their first robot for Reactor 1 stopped moving after

Breaking news Core removing struggle Cover-ups Fukushima Plant

Tepco started stating molten fuel might be out of pedestal of Reactor 1

Tepco has been stating the molten fuel dropped into pedestal under RPV (Reactor Pressure Vessel), but started changing their tone since the end of 2014 for some reason. Pedestal is

Breaking news Core removing struggle Fukushima Plant

IRID SAW no fuel or water remaining in reactor core of Reactor 1

Following up this article.. Tepco to start “scanning” inside of Reactor 1 in early February by using muon [URL]   IRID (International Research Institute for Nuclear Decommissioning) and High Energy Accelerator Research

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

Cs-134/137 density of Reactor 1 basement water continues to increase since last July / 1,790,000,000Bq/m3

According to Tepco, Cs-134/137 density of contaminated water that is retained in the basement of Reactor 1 has been increasing since last July. On 3/4/2015, Tepco published the latest data

Breaking news Contaminated water crisis Fukushima Plant

All β nuclide density reached the highest levels at 4 of 5 observation wells in Reactor 1 seaside

On 2/16/2015, Tepco reported all β nuclide (to include Strontium-90) density became the highest at 4 of 5 boring wells in Reactor 1 seaside. The highest reading was 330,000 Bq/m3.

Breaking news Core removing struggle Fukushima Plant

Tepco to start “scanning” inside of Reactor 1 in early February by using muon

Photo : A sample image of muon scanning method inside of a nuclear reactor.   On 12/25/2014, Tepco announced they are going to scan inside of Reactor 1 ~ 3

Breaking news Cover-ups Fukushima Plant

Tepco released photos of Reactor 1 / Fuel handling machine barely hung just above SFP

↑ Overhead traveling crane lies over the fuel handling machine. The machine is barely hung over the spent fuel pool of Reactor 1.   Tepco’s photos showed the reality of