Tag "melt through"

Back to homepage
Breaking news Cover-ups Fukushima Plant

Mass media reported Reactor 2 has almost no fuel inside / 6 months later than the first academic report

Following up this article.. Nagoya Uni “Significantly small amount of fuel remaining in Reactor 2″ / No announcement about underground [URL]   The mass media in Japan such as NHK reported

Breaking news Core removing struggle Cover-ups Fukushima Plant

Tepco started stating molten fuel might be out of pedestal of Reactor 1

Tepco has been stating the molten fuel dropped into pedestal under RPV (Reactor Pressure Vessel), but started changing their tone since the end of 2014 for some reason. Pedestal is

Breaking news Core removing struggle Fukushima Plant

Nagoya Uni “Significantly small amount of fuel remaining in Reactor 2″ / No announcement about underground

Related to this article.. IRID SAW no fuel or water remaining in reactor core of Reactor 1 [URL]   On 3/20/2015, Nagoya University announced they SAW the remaining nuclear fuel in

Breaking news Core removing struggle Fukushima Plant

IRID SAW no fuel or water remaining in reactor core of Reactor 1

Following up this article.. Tepco to start “scanning” inside of Reactor 1 in early February by using muon [URL]   IRID (International Research Institute for Nuclear Decommissioning) and High Energy Accelerator Research

Breaking news Cover-ups Fukushima Plant

Underground structure rapidly heated by up to 40℃ when water reduced

Underground trench water gets rapidly heated when water level decreases, according to Tepco.   On 10/3/2014, Tepco released the report about the failed frozen water wall project. (cf, Tepco to

Breaking news Cover-ups Fukushima Plant

Crawler inspector found extremely radioactive “something” on the bottom of suppression chamber Reactor2

On 9/30/2014, Tepco published the video record of Reactor2 taken by the crawler inspector. It is a part of the coolant system, “S/C (suppression chamber)” of Reactor2. The inspector robot

Breaking news Cover-ups Fukushima Plant

Molten fuel might be out of concrete base to directly damage primary containment vessel of Reactor 1

Photo : Reactor 1 taken on 4/15/2011     Molten fuel might be already outside of the concrete base and damaging the vulnerable part of PCV (Primary Containment Vessel) in

Breaking news Cover-ups Fukushima Plant

Tepco “Molten fuel in Reactor 3 is only 26cm to the outside of primary containment vessel”

Photo : Reactor 3 on 4/10/2011. When this picture was taken, nuclear fuel was already melting out of the vessel.    Following up this article..   Tepco admitted most part

Breaking news Cover-ups Fukushima Plant

Tepco admitted most part of fuel melted out of reactor pressure vessel in Reactor 3

Photo : Reactor 3. Taken on 4/16/2011.   On 8/6/2014, Tepco announced they assume “most part” of fuel melted out of reactor pressure vessel in Reactor 3. This is their

Core removing struggle

Most of fuel NOT remaining in reactor1 core / Tepco “but molten fuel is stopped in the concrete base”

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Related to this article.. Tepco “More fuel debris