Tag "common pool"

Back to homepage
Breaking news Cover-ups Fukushima Plant

Marine radiation monitoring post down after M7.4

Following up this article.. [Breaking] M7.3 Fukushima offshore / 3m of Tsunami is coming / Fukushima plant status unknown [URL]   In the evening of 11/22/2016, Tepco announced the radiation monitoring

Breaking news Cover-ups Fukushima Plant

NRA announced the dry cask for spent fuel of Fukushima plant might be overly vulnerable

On 12/4/2015, NRA (Nuclear Regulation Authority) announced that the dry cask to store the spent fuel assemblies can be excessively vulnerable. In order to stock the fuel assemblies of SFP

Breaking news Fukushima Plant Spent Fuel Pools

Tepco “All the spent fuel assemblies removed from SFP 4″ – Videos and Photos

On 11/5/2014, Tepco announced they completed transferring all of the 1,331 spent fuel assemblies from SFP 4 (Spent Fuel Pool of Reactor 4) to common pool.   They started removing

Contaminated water crisis Cover-ups Fukushima Plant

Unknown groundwater started breaking into common pool as storage facility of SFP4 fuel

Contaminated groundwater has started breaking into common pool, to where Tepco is transferring the fuel assemblies from Reactor4 pool. From Tepco’s announcement of 7/3/2014, they found groundwater was leaking into

Spent Fuel Pools

Tepco to transfer a part of fuel from Reactor4 pool to another spent fuel pool due to the lack of space

Tepco ends up transferring fuel from a spent fuel pool to another spent fuel pool.   On 6/18/2014, Tepco announced that they are running out of the space for Reactor4

Spent Fuel Pools

220 fuel assemblies removed from reactor4 pool by 1/22/2014

Note : If you are from the international mass media, Don’t read this site before having a contact with me.     Following up this article.. Tepco doesn’t have the

Spent Fuel Pools

Tepco doesn’t have the enough room to accept all the spent fuel in the common pool

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     There is no enough space in the common

Uncategorized

Next schedule of fuel removal not decided

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     On 11/22/2013, Tepco completed transferring the first 22

Uncategorized

Tepco “Brown material from fuel is the dirt of reactor4 pool”

Note : If you are from the international mass media, Don’t read this site before taking a contact with me.     Following up this article.. [Photo] Brown material released