The roof of North-West part of Reactor 3 had been collapsed in 3. 2011 – Photo

On 7/11/2014, Tepco announced the roof of North-Western part of Reactor3 had been collapsed during 311.

The operation floor, the top of Reactor 3 building therefore has no “floor” in North-Western part.

Tepco dragged a camera from a crane and took pictures on 7/8/2014. 2 of them were released on 7/11/2014.

Still none of the details about the inside of Reactor 3 has been announced.

 

From the top of Reactor 3 (May. 2014)

3 The roof of North-West part of Reactor 3 had been collapsed in 3. 2011 - Photo

 

From the angle of (1)

The roof of North-West part of Reactor 3 had been collapsed in 3. 2011 - Photo

 

From the angle of (2)

2 The roof of North-West part of Reactor 3 had been collapsed in 3. 2011 - Photo

 

 

 

http://www.tepco.co.jp/nu/fukushima-np/handouts/2014/images/handouts_140711_06-j.pdf

 

 

You read this now because we’ve been surviving until today.

_____

Français :

La partie Nord-Ouest du plafond  du réacteur 3 s’était effondrée en mars 2011 – Photo

 

Le 11 juillet 2014, Tepco a déclaré que la partie Nord-Ouest du toit du réacteur 3 s’était effondrée en mars 2011.
L’étage opérationnel est au sommet du bâtiment du réacteur 3, donc il n’y avait plus “d’étage” au nord-ouest.
Tepco avait suspendu un appareil photo à une grue le 8 juillet 2014 et a fait quelques photos. 2 d’entre elles sont publiées ce 11 juillet 2014.
Aucun détail n’a encore été donné quant à l’état de l’intérieur du réacteur 3.

Le haut du réacteur (3 Mai 2014)
3 The roof of North-West part of Reactor 3 had been collapsed in 3. 2011 - Photo

Vue selon l’angle (1)
The roof of North-West part of Reactor 3 had been collapsed in 3. 2011 - Photo

Vue selon l’angle (2)
2 The roof of North-West part of Reactor 3 had been collapsed in 3. 2011 - Photo

http://www.tepco.co.jp/nu/fukushima-np/handouts/2014/images/handouts_140711_06-j.pdf

Vous pouvez lire ceci parce que nous avons survécu jusqu’à aujourd’hui.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories

July 2014
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
28293031