Cover-ups

Back to homepage
Breaking news Cover-ups Fukushima Plant

Radiation alarm went off at dust monitoring post in the Southern border of Fukushima plant

On 1/13/2016, a dust monitoring post issued a warning of high radiation level, according to Tepco. The alarm went off at 0:39. The monitoring post situated near the Southern border

Breaking news Cover-ups Fukushima Plant

Tepco reported radiation level of Reactor 2 suddenly dropped just after Reactor 4 blasted during 311

Following up this article.. [Photo]Tepco admitted Reactor2, 3 directly released radioactive material to the air by 3.15.11/100Sv/h in PCV [URL]   On 12/17/2015, Tepco announced that they observed a sudden decrease

Breaking news Cover-ups Fukushima Plant

[Photo]Tepco admitted Reactor2, 3 directly released radioactive material to the air by 3.15.11/100Sv/h in PCV

On 12/17/2015, Tepco reported that radioactive material was directly released to the air from Reactor 2 and 3 by 3/15/2011 with relevant photos. From their latest analysis, PCV (Primary Containment

Breaking news Cover-ups Fukushima Plant

Underground wall nearly doubled the increasing speed of retained water in plant buildings

Following up this article.. Increasing groundwater is “bulging” the coastal area of Fukushima plant after building underground wall [URL]   On 12/18/2015, Tepco reported to NRA (Nuclear Regulation Authority) that the

Breaking news Cover-ups Fukushima Plant

NRA announced the dry cask for spent fuel of Fukushima plant might be overly vulnerable

On 12/4/2015, NRA (Nuclear Regulation Authority) announced that the dry cask to store the spent fuel assemblies can be excessively vulnerable. In order to stock the fuel assemblies of SFP

Breaking news Cover-ups Fukushima Plant

[Photo] Reactor 1 could have been severely collapsed if M4.8 occurred 6 hours earlier on 11/19

Tepco’s decommissioning attempt could have collapsed the crippled Reactor 1 on 11/19/2015. This is not largely recognized by the mass media.   According to Tepco, they started removing the minor

Breaking news Cover-ups Fukushima Plant

Tepco suddenly released the video of mock-up facility to dismantle Reactor 1

On 11/5/2015, Tepco released the video of mock-up training without any explanation. The video has only 20 seconds and no other description is attached. The location of this mock-up facility

Breaking news Cover-ups Fukushima Plant

Tepco admitted uneven settlement in Fukushima plant

On 11/5/2015, Tepco reported they surveyed the uneven settlement in Fukushima plant. It has been known that the entire plant area sank approx. by 700 mm after 311, however the

Breaking news Cover-ups Fukushima Plant

Radiation level near the bottom of exhaust stack jumped up double since last year

Following up this article.. Tepco to shield reactor1 pool coolant system against the damaged stack / Stopping cooling the pool for 11 days [URL]   According to Tepco, they detected 950

Breaking news Cover-ups Fukushima Plant

Tepco’s camera caught possible living creature inside Reactor 3 vessel of 1 Sv/h

Following up this article.. [Video] Tepco investigated the inside Reactor 3 vessel / 1 Sv/h, “sediment” accumulated [URL]   In the follow-up investigation, Tepco’s camera caught possible aquatic living creature