Contaminated water crisis

Back to homepage
Breaking news Contaminated water crisis Environmental contamination Fukushima Plant

2,200,000,000,000 Bq of All β nuclides leaked to the Pacific in the recent 314 days

On 3/25/2015, Tepco reported to NRA (Nuclear Regulation Authority) that 2,200,000,000,000 Bq of All β nuclide (including Strontium-90) leaked from the plant area to the plant port in the recent

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

Tritium density rose up 17 × in groundwater

On 3/18/2015, Tepco announced they measured Tritium density increased 17 times much as previous reading in groundwater. 2 days after, Tritium density also increased over 8 times much as previous reading

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

Cs-134/137 density of Reactor 1 basement water continues to increase since last July / 1,790,000,000Bq/m3

According to Tepco, Cs-134/137 density of contaminated water that is retained in the basement of Reactor 1 has been increasing since last July. On 3/4/2015, Tepco published the latest data

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

Highest density of Cs-134/137 detected at 2 locations of Reactor 2 seaside / 4 × the previous highest reading

On 3/16/2015, Tepco announced they measured the highest density of Cs-134/137 at 2 boring wells located in Reactor 2 seaside. The sampling date was 3/16/2015. The readings were 303,000 Bq/m3

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

Data shows Reactor 3 & 4 seaside already under groundwater since 3/10/2015 / No announcement from Tepco

Tepco’s own data shows the seaside of Reactor 3 and 4 is already under groundwater, which came up from underground. It is the trend data of groundwater level published on 3/13/2015.

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

Radiation level spiked up 30× in groundwater / Tepco “Still no leakage to the sea”

Photo : The leakage point of highly contaminated water. (3/10/2015)   Following up this article.. 750 t of contaminated rainwater leaked to underground / “Bubble came up from the ground” [URL]

Breaking news Contaminated water crisis Cover-ups Fukushima Plant

750 t of contaminated rainwater leaked to underground / “Bubble came up from the ground”

On 3/10/2015, Tepco announced approx. 750 t of highly contaminated rainwater leaked out of a dam and sank into the ground. The cause has not been identified.   It is

Breaking news Contaminated water crisis Environmental contamination Fukushima Plant

Tepco admits 400,000,000 Bq of All β leaked to the sea / Radiation level jumped over double in seawater

Following up this article.. 7,230,000 Bq/m3 of all β nuclide leaked from drain to the sea / “Contamination level suddenly jumped up” [URL]   On 3/4/2015, Tepco announced they estimate

Breaking news Contaminated water crisis Fukushima Plant

Tepco trying to stop 30,000,000 Bq/m3 of Cs-134/137 water with sandbag and blue sheeting

Following up this article.. 29,400,000 Bq/m3 of Cs-134/137 from water on the roof of Reactor 2 / kept flowing to the Pacific for 4 years [URL]   At this moment,

Breaking news Contaminated water crisis Fukushima Plant

13,440,000 Bq of Cs-134/137 found leaking in Reactor 4 building / Tepco “This is not contaminated water”

1.2 t of contaminated water found leaking in Reactor 4 building, according to Tepco. A leakage detector went off at 11:19 of 2/27/2015, however a Tepco employee couldn’t find the