Groundwater reached 10cm to the surface of the ground on the seaside of reactor2 / Tepco “No details are verified”

Following up this article..Groundwater level reached 25cm to the surface of the ground on the seaside of reactor2 / No rainfall [URL]

According to Tepco, the groundwater level of one of the borings reached 10cm to the surface of the ground.

The boring is located on the seaside of reactor2. The groundwater level of this boring has been indicating the extreme ups and downs regardless of the lack of rainfalls.

Groundwater levels of other borings don’t show the similar trend. In the press conference of 8/28/2013, Tepco’s spokesman stated they don’t verify the details.

Groundwater reached 10cm to the surface of the ground on the seaside of reactor2 / Tepco "No details are verified"

 

2 Groundwater reached 10cm to the surface of the ground on the seaside of reactor2 / Tepco "No details are verified"

 

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130828_09-j.pdf

http://www.tepco.co.jp/tepconews/streaming/index-j.html

 

 

You can ignore the truth but the truth won’t ignore you.

_____

Français :

Sur le côté mer du réacteur 2 les eaux souterraines sont à 10 cm de la surface du sol / Tepco : “aucune confirmation en détail”

 

Article lié : Sur le côté mer du réacteur 2 le niveau des eaux souterraines est à 25 cm de la surface / il n’a pas plu

Selon Tepco, le niveau des eaux souterraines est à 10 cm de la surface du sol dans l’un des forages.

Ce forage est sur le côté mer du réacteur 2. Il est celui où ont été relevés les records des minima et maxima sans tenir compte de l’absence de pluies.
Le niveau des eaux souterraines dans les autres forages ne se comportent pas de cette façon. Au cours de la conférence de presse du 28 aout 2013, le porte-parole de Tepco a affirmé qu’ils n’en ont pas vérifié les détails.

Groundwater reached 10cm to the surface of the ground on the seaside of reactor2 / Tepco "No details are verified"
2 Groundwater reached 10cm to the surface of the ground on the seaside of reactor2 / Tepco "No details are verified"

http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_130828_09-j.pdf
http://www.tepco.co.jp/tepconews/streaming/index-j.html

Vous pouvez ignorer la vérité mais la vérité ne vous ignorera pas.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories

August 2013
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031