8.5 mSv/h on the ground in the seaside of reactor3 / Groundwater accumulating area

Because the groundwater is stopped flowing to the sea on the east side of reactor2, the water is assumed to be traveling to reactor3 side.

According to Tepco, the radiation level on the ground of reactor3 seaside is significantly high.

The measurement date was 7/24/2013. It is not known why Tepco measured the radiation level in this area at this timing. They haven’t measured the ground surface radiation level in this area before.

The radiation level on the surface of the ground was 8.5 mSv/h. The highest atmospheric dose was 1.8 mSv/h.

 

8.5 mSv/h on the ground in the seaside of reactor3 / Groundwater accumulating area

 

Related article..Reactor3 seawater tunnel layout drawings differ from Tepco’s maps [URL]

 

http://www.tepco.co.jp/nu/fukushima-np/f1/surveymap/images/f1-sv-20130805-j.pdf

http://www.tepco.co.jp/nu/fukushima-np/f1/surveymap/images/f1-sv-20130724-j.pdf

http://www.tepco.co.jp/nu/fukushima-np/f1/surveymap/images/f1-sv-20130225-j.pdf

 

 

Truth is not truth because everyone believes in it. It’s the truth because it’s consistent and can’t be rebutted.

_____

Français :

8,5 mSv/h au sol côté mer du réacteur 3 / zone d’accumulation des eaux souterraines

 

Les eaux sont supposées s’écouler vers le réacteur 3 parce que la voie vers la mer des eaux souterraines est bloquée à l’Est du réacteur 2.

Selon Tepco, la radioactivité au sol côté mer du réacteur 3 est sérieusement élevée.
La mesure date du 24 juillet 2013. On ne sait pas pourquoi Tepco n’a pas relevé avant la radioactivité de surface à cet endroit.
La radioactivité à la surface du sol était de 8,5 mSv/h. Le record de dose ambiante était de 1,8 mSv/h.

8.5 mSv/h on the ground in the seaside of reactor3 / Groundwater accumulating area

Article lié : Les positions des tunnels d’eau de mer du réacteur 3 diffèrent selon les plans de Tepco

http://www.tepco.co.jp/nu/fukushima-np/f1/surveymap/images/f1-sv-20130805-j.pdf
http://www.tepco.co.jp/nu/fukushima-np/f1/surveymap/images/f1-sv-20130724-j.pdf
http://www.tepco.co.jp/nu/fukushima-np/f1/surveymap/images/f1-sv-20130225-j.pdf

Ce n’est pas la vérité parce que tout le monde y croit. C’est la vérité parce que c’est cohérent et irréfutable.

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories

August 2013
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031