Archive

Back to homepage
Column Contaminated water crisis Sea contamination

[Column] Know before newspaper writes- Groundwater bypass is a dangerous performance

The world must be prepared for the next stage of Fukushima plant. Soon they will have to remember everything that has happened.   Just after 311, Japanese government flew the

Uncategorized

Trading profit of Fukushima medical university in 2012 marked the highest since 2006/ 1.3 billion yen, 25%↑ from 2011

According to Fukushima medical university, they made 1,339,000,000 JPY of trading profit in 2012, which is the highest since 2006. It is also 25% higher than 2011. The hospital income

Contaminated water crisis Cover-ups Sea contamination

Tepco’s data shows 600 tones of groundwater flows to the sea everyday

On 8/7/2013, the Agency of Natural Resources and Energy admitted 300 tones of groundwater flows to the Pacific everyday. (cf, [Breaking] JP Gov admitted 300 tones of contaminated water flows

Contaminated water crisis Sea contamination

Tepco “Rising groundwater might have started spreading to neighboring areas 1 week ago”

The contaminated groundwater level is rising on the seaside of reactor2 due to the impervious wall. In the press conference of 8/9/2013, Tepco admitted the rising water might have already

Contaminated water crisis Sea contamination

Tritium density jumped up 150% in 2 days on the seaside of reactor1

Following up this article..23,000,000 Bq/m3 of Tritium on the seaside of reactor1 / Contaminated groundwater may spread over South to North [URL]   On 8/10/2013, Tepco announced they measured 34,000,000

Core removing struggle

Reactor4 roof materials found in the vessel

According to Tepco, they found a part of the reactor4 roof materials inside of the RPV. They investigated inside of the vessel from 8/5 to 8/7/2013. In the press conference

Contaminated water crisis Cover-ups Plant hazard Sea contamination

Fukushima worker had 0.89 mSv exposure at boring making mission

In the press conference of 8/9/2013, Tepco announced a Fukushima worker had 0.89 mSv for making the boring. The location is near where the severe leakage happened in 2011 on