The second cesium adsorption apparatus “Sarry” to be suspended for inspection

From 3/15 to 3/22/2013, the second cesium adsorption apparatus “Sarry” will be suspended for reliability improvement and inspection.

Tepco is running out of the capacity to stock contaminated retained water. The radioactivity density of seawater around reactor1~4 is increasing for some reason, which may be caused by leakage of contaminated water to the sea.

The second cesium adsorption apparatus "Sarry" to be suspended for inspection

2 The second cesium adsorption apparatus "Sarry" to be suspended for inspection

3 The second cesium adsorption apparatus "Sarry" to be suspended for inspection

4 The second cesium adsorption apparatus "Sarry" to be suspended for inspection

http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130313_02-e.pdf

 

 

_____

Français :

Le 2e appareillage d’absorption du césium, “Sarry”, va être arrêté pour inspection

 

Du 15 au 22 mars 2013, le second appareillage d’absorption du césium “Sarry” va être arrêté pour amélioration de fiabilité et inspection.

Tepco est en manque de capacité de stockage des eaux contaminées. La radioactivité de l’eau de mer autour des réacteurs 1 à 4  augmente, ce qui peut être dû à une fuite des eaux contaminées en mer.

Le 2e appareillage d’adsorption du césium,

2 Le 2e appareillage d’adsorption du césium,

3 Le 2e appareillage d’adsorption du césium,

4 Le 2e appareillage d’adsorption du césium,

http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130313_02-e.pdf

About this site

This website updates the latest news about the Fukushima nuclear plant and also archives the past news from 2011. Because it's always updated and added live, articles, categories and the tags are not necessarily fitted in the latest format.
I am the writer of this website. About page remains in 2014. This is because my memory about 311 was clearer than now, 2023, and I think it can have a historical value. Now I'm living in Romania with 3 cats as an independent data scientist.
Actually, nothing has progressed in the plant since 2011. We still don't even know what is going on inside. They must keep cooling the crippled reactors by water, but additionally groundwater keeps flowing into the reactor buildings from the broken parts. This is why highly contaminated water is always produced more than it can circulate. Tepco is planning to officially discharge this water to the Pacific but Tritium is still remaining in it. They dilute this with seawater so that it is legally safe, but scientifically the same amount of radioactive tritium is contained. They say it is safe to discharge, but none of them have drunk it.

Categories