Archive

Back to homepage
Uncategorized

The first floor of the steel framing of reactor4 cover was completed

On 1/14/2013, Tepco completed the steel framing cover of reactor4 for fuel removal. http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130115_01-e.pdf Iori Mochizuki _____ Français : Le premier étage de l’infrastructure d’acier devant couvrir le réacteur 4

Core removing struggle Plant hazard

Tepco temporarily stopped updating the plant parameters of reactor2 including the temperature data

In reactor2, two thermometers are still indicating the increasing temperature in RPV even after Tepco declared they were broken. [Link1] In the afternoon of 1/16/2013 (JST), Tepco stopped updating the

Uncategorized

[Express] “This is how incineration ash of sewage sludge is stocked in Kanazawa ward Yokohama”

Introducing important tweets as [Express] for simultaneous updates.   横浜市金沢区では下水汚泥焼却灰をこのように管理していくという。 twitter.com/GuciYama/statu… — GuciYamaさん (@GuciYama) 1月 16, 2013 <Translate> In Kanazawa ward Yokohama city, they stock the incineration ash of sewage